A reduce dig has started to allow for a concrete base slab to be put in to support the building.
The concrete base slab has been put in to support the building, which has then been shuttered up and water proofed.
Then reinforced steel has been put in ready for the concrete pouring.
A sunny day perfect for the concrete to dry. Foundations are being prepared to prevent unequal settlement of the structure.
The floor screeding will begin for a smooth base. This is to provide a solid, smooth foundation for your final floor.
Making the floor even, as this could affect the structure of the floor if uneven.
Starting to build the substructure and foundations of the building. Then setting out to start building the pool.